Welcome!  Bethlehem Construction, Inc. invites you to look around and experience all that we have to offer.  Our Website is continually changing and growing, so please stop by from time to time and see what is new.  If you have any questions, or would like further information, please feel free to contact us.

 

 


Chris Crimins
Precast Manager

Mr. Crimins has been working in the Precast Industry since 1982.  Chris’s precast experience includes prisons, stadiums, parking structures, docks, federal, state, industrial, commercial, and residential projects. Chris has devoted his career to the precast / prestress industry.  He began as a plant laborer and has literally worked at all precast plant positions.  Chris has designed and supervised the installation of concrete batch plants, TT, flat, hollow core, girder, beam, modular prison cell, and many specialty production-casting lines.  Chris is a member of the Precast Concrete Institute (PCI) and the American Concrete Institute (ACI).  Chris has extensive experience with concrete sandwich panels, and is part of the management team at Bethlehem that has the distinction of being the world’s largest producer of Thermomass concrete sandwich panels.  Chris works on a daily basis with the contractors, owners, design team, and plant production personnel.  He strives to and knows the importance of producing precast products that meet project quality, schedule and budget requirements.

Continuing Education

  • Precast Concrete Institute, Inspector/Technician – Levels I, II, & III

  • American Concrete Institute Testing Technician – Grade I

  • Management and Leadership Workshops

  • Prestress Concrete Institute Workshops

  • World of Concrete Seminars and Workshops (various years)

  • CONEXPO – CON/AGG Seminars and Workshops (various years)

Experience

  • 1982-Present    Precast Manager, Bethlehem Construction, Inc., Cashmere, WA

Sampling of Recent Bethlehem Construction Projects

  • Dreyer's Grand Ice Cream, Bakersfield, CA

          Precast Wall Panels for a new Food Production Facilities Expansion  - 16,250 SF.

  • Familgia - Inn at Cave 'B', George, WA

          New Hospitality Facilities including individual casitas and a lodge.  Project includes precast wall panels cast with rock finish imported from site.

  • Rock Island Hydro Operations and Engineering Offices, Rock Island, WA

          Precast Hollow Core, Beams and Columns for a new 3,500 SF Office Addition.

  • Boy's & Girl's Club of King County, Federal Way, WA

          Precast Wall Panels for a new 16,000 SF Youth Center.

  • Morgan Storage, Quincy, WA

          New Controlled Atmosphere Storage Facility - 16,250 SF.

  • Dovex Fruit Company, Wenatchee, WA

          New Packing Line Expansion - 3,700 SF.  Project included precast concrete wall panels cast with form liners for a cmu block finish.

  • Northwest Detention Center, Tacoma, WA

Precast Wall Panels, Hollow Core Floor/ Roof Planks, Beams, and Double Tee Roof Planks for a new Detention Center.

  • (TRACON) Terminal Radar Approach Control, Seatac, WA

Precast Wall Panels for a new Terminal Radar Approach Control Facility.

  • Blackhills, Tumwater, WA

Precast Hollow Core Floor Planks for a Distribution Warehouse. 

Total Area - 24,000 SF.

  • Clearwater Resort Casino, Squamish, WA

Precast Hollow Core Floor Planks.

 Total Area - 18,650 SF.

  • Everett Events Center Sports Arena, Everett, WA

Precast Columns, Beams, Girders, Raker Beams, Stadia Sections for a 12,000 seat Sports Arena.

  • Sound Transit - Kent Parking Garage, Kent, WA

Precast Parking Garage Structure with precast columns, girders, beams and spandrel caps. 

Total Area -  280,200 SF

  • Sound Transit - Auburn Parking Garage, Auburn, WA

Precast Parking Garage Structure with precast columns, girders, beams and spandrel caps. 

Total Area -  218,400 SF

  • AT&T Web Hosting Center, Lynnwood, WA

Precast wall panels with form-liner for 30-foot high cantilevered substation and screen walls. 

Total Area - 30,0000 SF

  • MCI Worldcom, Kent, WA

Precast tilt-up high tech communications facility, with plant-cast architectural exterior wall panels. 

Total Area - 124,700 SF   Precast only - 47,000 SF

  • Northtown Parking Garage, Spokane, WA

3-level parking garage structure with precast column/ beam/ Double Tee and flat wall structure including foundations, slabs & shell structure erected in place. 

Total area –  300,000 SF,  Volume $2,750,000

  • Pacific View Office Complex - Parking Garage, Seattle, WA

Precast Hollow Core Floor Planks, Inverted Beams and Spandrels. 

Total Area - 50,000 SF.

  • Smith Brothers Dairy, Yakima, WA

Precast Hollow Core Planks.

  • Waste Water Treatment Plant, College Place, WA

Precast Double Tee and flat panels used for bridges and walkways.

  • Waste Water Treatment Plant, Government Camp, OR

Precast "Thermomass" concrete sandwich wall panels.

  • Waste Water Treatment Plant, Walla Walla, WA

Precast Double Tee panels for bridges and walkways.

  • McNary Dam & Stop Locks, McNary Dam, WA

Precast panels for ice and stop logs.

  • Seattle Center/ Mercer Arena, Seattle, WA

Precast Hollow core, beams and columns.

  • Potlach Electrical Buildings, Potlach, ID

Precast Double Tee 3 two-story wall, floor, and roof buildings.

  • Lucich Farms/ STEVCO - Phase I & II, Delano, CA

Precast Double Tee roof panels.

 Total Area - 110,000 SF

  • New Harbor Island Bridge Planks, Coeur d' Alene, ID

Roadway Bridge Planks.

  • Ito Fumigation Facility, Reedley, CA

Double Tee Roof System.

  • Watts - Morrow Cold Storage, Boardman, OR

Precast inulated wall panels for freezer/ processing facility.

 Total Area - 75,000 SF.

  • Watts Brothers Farms, Paterson, WA

Precast insulated wall panels for freezer/ processing facility.

  • Two Rivers Correctional Facility, Umatila, OR

488 Precast cells w/ floor slabs, wall panels, beams and columns.

  • Coffee Creek Correctional Facility, Wilsonville, OR

230 Precast cells w/ panels.

  • Wyeast Laboratories, Hood River, OR

Precast insulated wall panels, hollow core for office/ lab/ warehouse/ freezer.

  • Bear Creek Production Facility, Medford, OR

Precast insulated Architectural Tilt-Up Panels for remodel.

  • United States Postal Service, Everett, WA

Precast wall panels for loading dock expansion.

  • Seneca Foods, Yakima, WA

Precast Double Tee wall panels.

  • Tree Top, Yakima, WA

Precast insulated wall panels. 

Total Area - 110,000 SF

  • Edmonds Community College - Higher Education Center, Lynnwood, WA

Precast Hollow Core Floor/ Roof Planks.

  • Lamb Weston, Quincy, WA

Precast wall panels for new boiler building.

  • Northlake Dock Expansion, Seattle, WA

67 Precast dock panels.

  • Washington State Public Health Lab., Shoreline, WA

Precast Hollow Core Planks.


 
Contact design@bethlehemc.com with questions or comments about this web site.
Copyright © 2003 Bethlehem Construction, Inc.
Last modified: 06/15/04